Monday, March 12, 2007

Update

We walked down to the Breakwater last evening. It is very nice that the weather has warmed up enough to comfortably get out in the evening. Now with the later sunsets, we will be able to work on our boats longer. I find sailors get a little fidgety when things start to melt and the snow disappears off the boat covers. I know, they are forecasting snow on Thursday, but I guy can dream!?! If you haven't made it down to the project lately you probably haven't seen all the cement that has been poured over the past couple of weeks. And by the looks of it much of it will never be seen again. I am speaking of the sheet pile support blocks that are tied with a long metal rod to the back of the sheet pile. The are substantial. Once they are buried, they will be out of sight. The one large cement block that will be seen for a long time is the foundation for the gangway. There was an interesting phenomenon we saw last evening. The 80% of the ice in the inner harbour was covered with water - probably 6 or 8 inches. It must have been run-off as it was muddy coloured. It was flowing across the ice near 'A' dock and running into a crack in the ice beside the wharf. When I get an update from the Breakwater Committee, I will post it here. From a major construction point of view things are starting to wind down. We will see more detail work being done. If anyone has any interesting photo's, please don't hesitate to send them to me.

No comments: